top of page

Sydney Olympic Park - Project Overview

P1 Carpark Ventilation & BMS Upgrade

Client: EQUANS
Completion Status:  Completed in 2025


Integrata was engaged by EQUANS to deliver a complete upgrade of the P1 Carpark Ventilation Control System at Sydney Olympic Park. The project involved reverse engineering the existing control infrastructure, developing a new BMS-based ventilation control strategy, and delivering full installation, commissioning, and certification, all within a live operational car park environment.


The upgraded system was built on the iSMA CONTROLLI control platform, incorporating intelligent ventilation logic for both normal and emergency operation modes, integrated CO gas monitoring, and VSD fan pressure control.

 

Project Scope:

  • Reverse engineering and redesign of the existing ventilation control strategy to AS1668 standards

  • Design and implementation of a new BMS-based carpark ventilation control system

  • Integration of CO gas detection, ventilation fans, dampers, and MSSBs

  • VSD installation, commissioning, and pressure monitoring integration

  • Fire interface integration for emergency ventilation operation

  • Mechanical electrical modifications to existing control systems and switchboards

  • Installation of new touchscreen BMS front-end supervisor interface

  • Calibration and commissioning of all CO monitoring systems

  • Coordination with air balancing works and NCC 2022 compliance certification

  • Production of updated electrical schematics, ventilation drawings, and O&M manuals

​

Works were coordinated closely with EQUANS and site stakeholders to maintain operational continuity throughout delivery.

  • sopa-P1-car-park 1200x630px.png
  • Secure-Parking-Sydney-Olympic-Park-P1-Car-Park_5a42645fff05f5ca7ac24a5ae44e2c0b.png
  • Secure-Parking-Sydney-Olympic-Park-P1-Car-Park_f5a21eb1f8bd5577c77e1964813f13ff.webp
  • 142819 - Sydney Olympic Park aerial - Credit Ethan Rohloff - Destination NSW.jpg
bottom of page